Committee:
ISO/TC 11 Boilers and pressure vessels
ISO/TC 109 Oil and gas burners
CEN/TC 269 Shell and water-tube boilers
Standards developed by the committee: CTN 9: 168
Status: ANULADA / 2023-07-26
Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler
Status: ANULADA / 2023-02-01
Automatic forced draught burners for liquid fuels
Status: ANULADA / 2022-11-02
Water-tube boilers and auxiliary installations - Part 10: Requirements for safeguards against excessive pressure
Water-tube boilers and auxiliary installations - Part 2: Materials for pressure parts of boilers and accessories
Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler
Water-tube boilers and auxiliary installations - Part 6: Inspection during construction; documentation and marking of pressure parts of the boiler
Status: ANULADA / 2022-05-01
INSTALLATIONS FOR OIL SUPPLY SYSTEMS FOR OIL BURNERS. PART 1: SAFETY REQUIREMENTS AND TESTS; PARTS, OIL FEED PUMPS, CONTROL AND SAFETY DEVICES, SUPPLY TANKS.
Installations for oil supply systems for oil burners - Part 2: Safety requirements and tests - Parts, valves, pipes, filters, oil de-aerators, meters.
Status: ANULADA / 2021-11-10
Stainless steel shell boilers
Status: ANULADA / 2020-11-18
Shell boilers - Part 5: Inspection during construction, documentation and marking of pressure parts of the boiler
Status: ANULADA / 2019-03-13
Shell boilers - Part 4: Workmanship and construction of pressure parts of the boiler.
Status: ANULADA / 2018-07-18
Flanged automatic steam traps - Face-to-face dimensions (ISO 6554:1980)
Status: ANULADA / 2018-04-11
Automatic steam traps - Marking (ISO 6553:1980)
Status: ANULADA / 2017-04-26
Shell boilers - Part 3: Design and calculation for pressure parts.
Status: CANCELLED / 2016-04-20
Water-tube boilers and auxiliary instalations. Part 1: General.
Status: ANULADA / 2014-06-25
Water tube boilers and auxiliary installations. Part 7: Requirements for equipment for the boiler.
Status: ANULADA / 2013-01-23
Shell boilers - Part 1: General
Status: ANULADA / 2013-01-16
Shell boilers - Part 2: Materials for pressure parts of boilers and accessories.
Status: ANULADA / 2012-10-24
Water tube boilers and auxiliary installations. Part 3: Design and calculation for pressure parts.
Status: CANCELLED / 2012-09-27
Water-tube boilers and auxiliary installations. Part 6: Inspection during construction; documentation and marking of pressure parts of the boiler.
Back to results New Search
Design your own personalised collection of standards. Keep your standards updated.