Committee:
GT 1 Contadores
ISO/TC 30 Measurement of fluid flow in closed conduits
ISO/TC 113 Hydrometry
CEN/TC 92 Water meters
CEN/TC 171 Heat cost allocation
CEN/TC 176 Thermal Energy Meters
CEN/TC 244 Measurement of fluid flow in closed conduits
CEN/TC 294 Communication systems for meters
CEN/TC 318 Hydrometry
Standards developed by the committee: CTN 82/SC 3: 137
Status: ANULADA / 2009-07-15
Measurement of liquid flow in open channels - Velocity-area methods. (ISO 748:1997)
Status: ANULADA / 2008-04-30
Water meters - Part 1: General requirements
Water meters - Part 2 : Installation and conditions of use
Water meters - Part 3 : Test methods and equipment
Status: ANULADA / 2007-10-03
Heat meters. Part 4: Pattern approval tests.
HEAT METERS. PART 4: PATTERN APPROVAL TESTS.
HEAT METERS. PART 5: INITIAL VERIFICATION TEST.
Heat meters. Part 5: Initial verification tests.
HEAT METERS. PART 6: INSTALLATION, COMMISSIONING, OPERATIONAL MONITORING AND MAINTENANCE.
Heat meters. Part 6: Installation, commissioning, operational monitoring and maintenance.
Status: ANULADA / 2007-07-18
HEAT METERS. PART 1: GENERAL REQUIREMENTS.
Heat meters. Part 1: General requirements.
HEAT METERS. PART 2: CONSTRUCTIONAL REQUIREMENTS.
Heat meters. Part 2: Constructional requirements.
Status: ANULADA / 2006-09-20
MEASUREMENT OF GAS FLOW BY MEANS OF CRITICAL FLOW VENTURI NOZZLES. (ISO 9300:1990).
Status: ANULADA / 2003-12-12
MEASUREMENT OF FLUID FLOW BY MEANS OF PRESSURE DIFFERENTIAL DEVICES. PART 1: ORIFICE PLATES NOZZLES AND VENTURI TUBES INSERTED IN CIRCULAR CROSS-SECTION CONDUITS RUNNING FULL. (ISO 5167-1:1991).
MEASUREMENT OF FLUID FLOW BY MEANS OF PRESSURE DIFFERENTIAL DEVICES. PART 1: ORIFICE PLATES, NOZZLES AND VENTURI TUBES INSERTED IN CIRCULAR CROSS-SECTION CONDUITS RUNNING FULL. (ISO 5167-1:1995/AM1:1998).
Back to results New Search
Design your own personalised collection of standards. Keep your standards updated.