Committee:
ISO/TC 138 Plastics pipes, fittings and valves for the transport of fluids
CEN/TC 155 Plastics piping systems and ducting systems
CEN/TC 164 Water supply
* Some activities of this TC correspond to other AEN/CTN.
Standards developed by the committee: CTN 53/SC 2: 661
Status: ANULADA / 2008-05-01
PLASTICS PIPING SYSTEMS FOR UNDERGROUND DRAINAGE AND SEWERAGE UNDER PRESSURE. GLASS-REINFORCED THERMOSETTING PLASTICS (GRP) BASED ON UNSATURATED POLYESTER RESIN (UP). PART 3: FITTINGS.
PLASTICS PIPING SYSTEMS FOR UNDERGROUND DRAINAGE AND SEWERAGE UNDER PRESSURE. GLASS-REINFORCED THERMOSETTING PLASTICS (GRP) BASED ON UNSATURATED POLYESTER RESIN (UP). PART 5: FITNESS FOR PURPOSE OF THE JOINTS.
Status: ANULADA / 2008-03-13
PLASTICS PIPING SYSTEMS - GLASS-REINFORCED THERMOSETTING PLASTICS (GRP) COMPONENTS - TEST METHODS TO PROVE THE DESIGN OF BOLTED FLANGE JOINTS
PLASTICS PIPING SYSTEMS. GLASS-REINFORCED THERMOSETTING PLASTICS (GRP) COMPONENTS. TEST METHODS TO PROVE THE DESIGN OF BOLTED FLANGE JOINTS.
PLASTICS PIPING SYSTEMS. GLASS-REINFORCED THERMOSETTING PLASTICS (GRP) COMPONENTS. TEST METHODS TO PROVE THE DESIGN OF CEMENTED SOCKET-AND-SPIGOT JOINTS.
PLASTICS PIPING SYSTEMS. GLASS-REINFORCED THERMOSETTING PLASTICS (GRP) COMPONENTS. TEST METHODS TO PROVE THE DESIGN OF RIGID LOCKED SOCKET-AND-SPIGOT JOINTS WITH ELASTOMERIC SEALS.
PLASTICS PIPING SYSTEMS. GLASS-REINFORCED THERMOSETTING PLASTICS (GRP) PIPES. DETERMINATION OF THE LONG-TERM ULTIMATE RELATIVE RING DEFLECTION UNDER WET CONDITIONS.
PLASTICS PIPING SYSTEMS. GLASS-REINFORCED THERMOSETTING PLASTICS (GRP) PIPES. DETERMINATION OF THE CREEP FACTOR UNDER WET CONDITIONS AND CALCULATION OF THE LONG-TERM SPECIFIC RING STIFFNESS.
Status: ANULADA / 2008-01-16
THERMOPLASTICS PIPES FOR THE CONVEYANCE OF FLUIDS. DETERMINATION OF RESISTANCE TO RAPID CRACK PROPAGATION (RCP). FULL-SCALE TEST (FST). (ISO 13478:1997).
Status: ANULADA / 2007-11-28
Plastics piping systems for buried applications with or without pressure - Glass-reinforced thermosetting plastics (GRP) based on polyester resin (UP).
Status: ANULADA / 2007-04-25
Hose fittings with clamp units - Part 7: Cam locking couplings
Hose fittings with clamp units - Part 1: Requirements, survey, designation and testing
Hose fittings with clamp units - Part 4: Flange connections
Hose fittings with clamp units - Part 6: TW tank truck couplings
Hose fittings with clamp units - Part 8: Symmetrical half coupling (Guillemin system)
Status: ANULADA / 2006-12-20
Plastics piping systems for non-pressure underground drainage and sewerage - Polyethylene (PE) - Part 1: Specifications for pipes, fittings and the system (Endorsed by AENOR in August of 2006.)
Status: ANULADA / 2006-11-22
Plastics piping systems for industrial applications - Poly(vinylidene fluoride) (PVDF) - Specifications for components and the system (ISO 10931:2005) (Endorsed by AENOR in August of 2006.)
Plastics piping systems for non-pressure underground drainage and sewerage - Polypropylene with mineral modifiers (PP-MD) - Part 1: Specifications for pipes, fittings and the system (Endorsed by AENOR in August of 2006.)
Status: ANULADA / 2006-11-08
EAVES GUTTERS AND FITTINGS MADE OF PVC-U. DEFINITIONS, REQUIREMENTS AND TESTING.
Status: ANULADA / 2006-10-31
Plastics piping systems - Thermoplastics shafts or risers for inspection chambers and manholes - Determination of resistance against surface and traffic loading (Endorsed by AENOR in August of 2006.)
Back to results New Search
Design your own personalised collection of standards. Keep your standards updated.