Committee:
ISO/TC 138 Plastics pipes, fittings and valves for the transport of fluids
CEN/TC 155 Plastics piping systems and ducting systems
CEN/TC 164 Water supply
* Some activities of this TC correspond to other AEN/CTN.
Standards developed by the committee: CTN 53/SC 2: 648
Status: ANULADA / 2014-12-01
Plastics piping systems for water supply - Polyethylene (PE) - Part 7: Guidance for the assessment of conformity
Plastics piping systems for non-pressure underground drainage and sewerage - Unplasticized poly(vinyl chloride) (PVC-U) - Part 3: Guidance for installation.
Plastics piping systems for non-pressure underground drainage and sewerage - Polypropylene with mineral modifier(s) (PP-MD) - Part 3: Guidance for installation.
Plastics piping systems for non-pressure underground drainage and sewerage - Polypropylene (PP) - Part 3: Guidance for installation
Plastics piping and ducting systems - Systems outside building structures for the conveyance of water or sewage - Pratices for installation above and below ground.
Status: ANULADA / 2014-11-26
Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure. Unplasticized poly(vinyl chloride) (PVC-U). Part 1: Requirements for pipes, fittings and the system.
PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 1: REQUIREMENTS FOR PIPES, FITTINGS AND THE SYSTEM
Status: ANULADA / 2014-11-12
Hose fittings with clamp units - Part 2: Hose side parts of hose tail
Hose fittings with clamp units - Part 4: Flange connections
Hose fittings with clamp units - Part 6: TW tank truck couplings
Hose fittings with clamp units - Part 8: Symmetrical half coupling (Guillemin system)
Status: ANULADA / 2014-09-10
Plastics piping systems for water supply for irrigation. Polyethylene (PE). Part 1: Specifications for pipes
Plastics piping systems for water supply for irrigation. Polyethylene (PE). Part 2: Fittings and the system
Status: ANULADA / 2014-07-02
Hose fittings with clamp units - Part 1: Requirements, survey, designation and testing
Status: ANULADA / 2014-05-01
Plastics piping systems for water supply - Unplasticized poly(vinyl chloride) (PVC-U) - Part 7: Guidance for the assessment of conformity.
Plastics piping systems for buried and above-ground drainage and sewerage under pressure - Unplasticized poly(vinyl chloride) (PVC-U) - Part 2: Guidance for the assessment of conformity
Plastics piping systems for water supply or drainage and sewerage. Glass-reinforced thermosetting plastics (GPR) based on unsaturated polyester resin (UP). Recommended practice for installation.
Plastics piping systems - Glass-reinforced thermosetting plastics (GRP) based on unsaturated polyester resin (UP) - Guidance for the structural analysis of buried GRP-UP pipelines
Status: ANULADA / 2014-02-19
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks - Part 7: Lining with spirally-wound pipes
Back to results New Search
Design your own personalised collection of standards. Keep your standards updated.