Committee:
IEC/TC 37 Surge arresters
IEC/TC 99 Insulation co-ordination and system engineering of high voltage electrical power installations above 1,0 kV AC and 1,5 kV DC
IEC/TC 109 Insulation co-ordination for low-voltage equipment
IEC/PC 127 Low-voltage auxiliary power systems for electric power plants and substations
CLC/SR 37 Surge arresters
CLC/SR 109 Insulation co-ordination for low-voltage equipment
CLC/TC 99X Power installations exceeding 1 kV a.c. (1,5 kV d.c.)
* Some activities of this TC correspond to other AEN/CTN.
Standards developed by the committee: CTN 207/SC 99: 54
Status: VIGENTE / 2025-07-23
Grounding electrode. Coupling cylindrical bars of Steel-copper.
Status: VIGENTE / 2024-07-17
Insulation co-ordination - Part 2: Application guidelines
Status: VIGENTE / 2024-01-26
SURGE ARRESTERS. PART 3: ARTIFICIAL POLLUTION TESTING OF SURGE ARRESTERS.
Status: VIGENTE / 2024-01-01
Insulation co-ordination - Part 11: Definitions, principles and rules for HVDC system (Endorsed by Asociación Española de Normalización in January of 2024.)
Status: VIGENTE / 2023-12-01
Power installations exceeding 1 kV AC and 1,5 kV DC - Part 2: DC (Endorsed by Asociación Española de Normalización in December of 2023.)
Status: VIGENTE / 2023-01-01
Insulation co-ordination - Part 11:Definitions, principles and rules for HVDC system
Insulation co-ordination - Part 12: Application guidelines for LCC HVDC converter stations (Endorsed by Asociación Española de Normalización in January of 2023.)
Status: VIGENTE / 2022-11-02
Earthing of power installations exceeding 1 kV a.c.
Status: VIGENTE / 2022-09-07
Power installations exceeding 1 kV AC and 1,5 kV DC - Part 1: AC (Endorsed by Asociación Española de Normalización in October of 2021.)
Status: VIGENTE / 2021-02-24
Insulation coordination for equipment within low-voltage supply systems - Part 1: Principles, requirements and tests
Status: VIGENTE / 2021-02-16
Grounding electrode. Coupling cylindrical bars of steel-copper.
GROUNDING ELECTRODE. COUPLING CYLINDRICAL BARS OF STEEL-COPPER.
Status: VIGENTE / 2020-06-24
Insulation co-ordination - Part 1: Definitions, principles and rules
Status: VIGENTE / 2018-10-17
Status: VIGENTE / 2018-05-01
Surge arresters - Part 5: Selection and application recommendations (Endorsed by Asociación Española de Normalización in May of 2018.)
Status: VIGENTE / 2018-03-01
Surge arresters - Part 8: Metal-oxide surge arresters with external series gap (EGLA) for overhead transmission and distribution lines of a.c. systems above 1 kV (Endorsed by Asociación Española de Normalización in March of 2018.)
Status: VIGENTE / 2018-02-28
Insulation coordination for equipment within low-voltage systems - Part 3: Use of coating, potting or moulding for protection against pollution
Status: VIGENTE / 2016-11-23
Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems
Status: VIGENTE / 2015-10-21
Insulation co-ordination - Part 5: Procedures for high-voltage direct current (HVDC) converter stations
Status: VIGENTE / 2015-01-01
Surge arresters - Part 9: Metal-oxide surge arresters without gaps for HVDC converter stations (Endorsed by AENOR in January of 2015.)
Back to results New Search
Design your own personalised collection of standards. Keep your standards updated.