Committee:
SC AT Trabajos en tensión en alta tensión
SC BT Trabajos en tensión en baja tensión
IEC/TC 78 Live working
IEC/PC 128 Operation of electrical installations
CLC/BTTF 62-3 Operation of electrical installations
CLC/TC 78 Equipment and tools for live working
Standards developed by the committee: CTN 204: 160
Status: ANULADA / 2016-08-31
Live working - Terminology for tools, equipment and devices
Status: ANULADA / 2016-05-17
Live working - Minimum approach distances for a.c. systems in the voltage range 72,5 kV to 800 kV - A method of calculation (IEC 61472:2004)
Status: ANULADA / 2016-02-12
Operation of electrical installations
Status: ANULADA / 2015-07-20
Live working - Hand tools for use up to 1 000 V a.c. and 1 500 V d.c.
Status: ANULADA / 2014-02-01
SADDLES, POLE CLAMPS (STICK CLAMPS) AND ACCESSORIES FOR LIVE WORKING.
Status: ANULADA / 2013-11-21
Insulated poles (insulating sticks) for electrical purposes on high-voltage installations.
Live working - Installation of distribution line conductors - Stringing equipment and accessory items.
LIVE WORKING. INSTALLATION OF TRANSMISSION LINE CONDUCTORS AND EARTHWIRES. STRINGING EQUIPMENT AND ACCESORY ITEMS.
LIVE WORKING. REQUIRED INSULATION LEVEL AND RELATED AIR DISTANCES. CALCULATION METHOD.
Status: ANULADA / 2013-05-01
Live working - Voltage detectors -- Part 3: Two-pole low-voltage type.
Status: ANULADA / 2013-04-01
Hydraulic cable cutting devices - Devices to be used on electrical installations with nominal voltage up to AC 30 kV.
Status: ANULADA / 2013-03-01
OPERATION OF ELECTRICAL INSTALLATIONS (NATIONAL ANNEXES).
Operation of electrical installations (national annexes).
INSULATING POLES (INSULATING STICKS) AND UNIVERSAL TOOL ATTACHMENTS (FITTINGS) FOR LIVE WORKING.
Status: ANULADA / 2012-06-01
Matting of insulating material for electrical purposes.
Blankets of insulating material for electrical purposes.
Back to results New Search
Design your own personalised collection of standards. Keep your standards updated.