Committee:
IEC/TC 65 Industrial-process measurement, control and automation
CLC/TC 65X Industrial-process measurement, control and automation
CEN/CLC/WS BIOMAT Data-driven management of production processes
Standards developed by the committee: CTN 203/SC 65: 827
Status: ANULADA / 2008-09-01
Industrial-process control valves -- Part 8: Noise considerations -- Section 1: Laboratory measurement of noise generated by aerodynamic flow through control valves (Endorsed by AENOR in December of 2000.)
Status: ANULADA / 2008-02-01
INDUSTRIAL-PROCESS CONTROL VALVES. PART 1: CONTROL VALVE TERMINOLOGY AND GENERAL CONSIDERATIONS.
Status: ANULADA / 2007-11-01
INDUSTRIAL-PROCESS CONTROL. SAFETY OF ANALYSER HOUSES.
Status: ANULADA / 2007-04-01
General purpose field communication system (Endorsed by AENOR in June of 2000.)
General purpose field communication system. (Endorsed by AENOR in November of 2002.)
GENERAL PURPOSE FIELD COMMUNICATION SYSTEM (Endorsed by AENOR in October of 1997.)
HIGH EFFICIENCY COMMUNICATION SUBSYSTEM FOR SMALL DATA PACKAGES (Endorsed by AENOR in April of 1999.)
FIELDBUS STANDARD FOR USE IN INDUSTRIAL CONTROL SYSTEMS. PART 2: PHYSICAL LAYER SPECIFICATION AND SERVICE DEFINITION.
FIELDBUS STANDARD FOR USE IN INDUSTRIAL CONTROL SYSTEMS. PART 2: PHYSICAL LAYER SPECIFICATION AND SERVICE DEFINITION (Endorsed by AENOR in May of 1996.)
FIELDBUS STANDARD FOR USE IN INDUSTRIAL ONTROL SYSTEMS. PART 2: PHYSICAL LAYER SPECIFICATION AND SERVICE DEFINITION (Endorsed by AENOR in November of 1997.)
Status: ANULADA / 2007-03-01
INDUSTRIAL-PROCESS CONTROL SYSTEMS. INSTRUMENTS WITH ANALOGUE INPUTS AND TWO-OR MULTI-STATE OUTPUTS.PART 1: METHODS OF EVALUATING THE PERFORMANCE. (Endorsed by AENOR in April of 1996.)
Status: ANULADA / 2006-12-01
METHODS OF EVALUATING THE PERFORMANCE OF ELECTRICAL AND PNEUMATIC ANALOGUE CHART RECORDERS FOR USE IN INDUSTRIAL-PROCESS CONTROL SYSTEMS.
Status: ANULADA / 2006-07-01
PROGRAMMABLE CONTROLLERS. PART 1: GENERAL INFORMATION.
Status: ANULADA / 2006-05-01
PROGRAMMABLE CONTROLLERS. PART 2: EQUIPMENT REQUIREMENTS AND TESTS.
Programmable controllers -- Part 2: Equipment requirements and tests.
PROGRAMABLE CONTROLLERS. PART 2: EQUIPMENT REQUIREMENTS AND TESTS.
Status: ANULADA / 2005-12-01
PROGRAMMABLE CONTROLLERS. PART 3: PROGRAMMING LANGUAGES.
Back to results New Search
Design your own personalised collection of standards. Keep your standards updated.