Committee:
IEC/TC 65 Industrial-process measurement, control and automation
CLC/TC 65X Industrial-process measurement, control and automation
CEN/CLC/WS BIOMAT Data-driven management of production processes
Standards developed by the committee: CTN 203/SC 65: 820
Status: ANULADA / 2019-08-20
Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools (Endorsed by AENOR in January of 2010.)
Status: ANULADA / 2019-07-21
Industrial-process measurement and control - Evaluation of system properties for the purpose of system assessment - Part 5: Assessment of system dependability
Industrial-process measurement and control - Evaluation of system properties for the purpose of system assessment - Part 6: Assessment of system operability
Industrial-process measurement and control - Evaluation of system properties for the purpose of system assessment - Part 7: Assessment of system safety
Industrial-process measurement and control - Evaluation of system properties for the purpose of system assessment - Part 8: Assessment of non-task-related system properties
Status: ANULADA / 2019-06-18
Industrial communication networks - Profiles - Part 3: Functional safety fieldbuses - General rules and profile definitions
Status: ANULADA / 2019-06-02
MINERAL INSULATED THERMOCOUPLE CABLES AND THERMOCOUPLES.
Status: ANULADA / 2019-04-10
Security for industrial automation and control systems - Part 4-1: Secure product development lifecycle requirements (Endorsed by Asociación Española de Normalización in May of 2018.)
Status: ANULADA / 2019-01-21
Industrial-process control valves - Part 2-3: Flow capacity - Test procedures
Status: ANULADA / 2018-10-21
Industrial-process control valves - Part 8-4: Noise considerations - Prediction of noise generated by hydrodynamic flow
Status: ANULADA / 2018-07-15
Function Blocks (FB) for process control - Part 3: Electronic Device Description Language (EDDL) (Endorsed by AENOR in August of 2011.)
Status: ANULADA / 2018-04-30
OPC unified architecture - Part 3: Address Space Model
OPC unified architecture - Part 4: Services (Endorsed by AENOR in March of 2012.)
OPC unified architecture - Part 5: Information model (Endorsed by AENOR in March of 2012.)
OPC unified architecture - Part 6: Mappings (Endorsed by AENOR in March of 2012.)
OPC unified architecture - Part 7: Profiles (Endorsed by AENOR in November of 2012.)
OPC unified architecture - Part 8: Data Access (Endorsed by AENOR in March of 2012.)
OPC unified architecture - Part 9: Alarms and conditions (Endorsed by AENOR in November of 2012.)
Status: ANULADA / 2018-04-15
OPC unified architecture - Part 10: Programs (Endorsed by AENOR in November of 2012.)
Status: ANULADA / 2018-04-01
Industrial-process control - Safety of analyser houses (Endorsed by AENOR in April of 2005.)
Back to results New Search
Design your own personalised collection of standards. Keep your standards updated.