Committee:
GT 2 Encofrados
GT 4 Plataformas de carga y descarga
CEN/TC 53 Temporary works equipment
* Some activities of this TC correspond to other AEN/CTN.
Standards developed by the committee: CTN 180: 39
Status: VIGENTE / 2020-11-18
Temporary works equipment - Execution - Requirements for manufacturing
Status: VIGENTE / 2020-03-04
Temporary works equipment - Recommendations for achieving health and safety
Status: VIGENTE / 2018-05-17
ADJUSTABLE TELESCOPIC STEEL PROPS. PRODUCTS SPECIFICATIONS, DESIGN AND ASSESSMENT BY CALCULATION AND TESTS.
Status: VIGENTE / 2014-02-01
Temporary works equipment - Load bearing towers of prefabricated components - Particular methods of structural design
Status: VIGENTE / 2010-07-14
Load and unload platforms for construction sites. Product specifications and test methods
Status: ANULADA / 2022-09-28
Couplers, spigot pins and baseplates for use in falsework and scaffolds - Part 1: Couplers for tubes - Requirements and test procedures
Couplers, spigot pins and baseplates for use in falsework and scaffolds - Part 2: Special couplers - Requirements and test procedures
Status: ANULADA / 2022-07-20
Formwork. General Design, performance requirements and verifications
Status: ANULADA / 2022-03-30
Mobile access and working towers - Rules and guidelines for the preparation of an instruction manual
Status: ANULADA / 2021-12-01
Mobile access and working towers made of prefabricated elements - Materials, dimensions, design loads, safety and performance requirements
Status: ANULADA / 2017-05-25
AUXILIARY AND DETACHABLE STEEL STRUCTURES. CLASSIFICATION AND DEFINITION
Status: ANULADA / 2012-05-23
Manually operated hydraulic shoring systems for groundwork support - Part 2: Assessment by calculation or test (Endorsed by AENOR in August of 2006.)
Status: ANULADA / 2012-05-09
Manually operated hydraulic shoring systems for groundwork support - Part 1: Product specifications (Endorsed by AENOR in August of 2006.)
Status: ANULADA / 2008-12-17
Falsework - Performance requirements and general design (Endorsed by AENOR in August of 2006.)
Status: ANULADA / 2008-02-27
Temporary works equipment - Load bearing towers of prefabricated components - Particular methods of structural design (Endorsed by AENOR in August of 2006.)
Couplers, spigot pins and baseplates for use in falsework and scaffolds - Part 1: Couplers for tubes - Requirements and test procedures (Endorsed by AENOR in August of 2006.)
Status: ANULADA / 2006-12-27
Mobile access and working towers made of prefabricated elements - Materials, dimensions, design loads, safety and performance requirements (Endorsed by AENOR in August of 2006.)
Status: ANULADA / 2006-08-01
COOPLERS, LOOSE SPIGOTS AND BASE-PLATES FOR USE IN WORKING SCAFFOLDS AND FALSEWORK MADE OF STEEL TUBES. REQUIREMENTS AND TEST PROCEDURES.
Status: ANULADA / 2005-06-01
SERVICE AND WORKING SCAFFOLDS MADE OF PREFABRICATED ELEMENTS. MATERIAL, DIMENSIONS, DESIGN LOADS AND SAFETY REQUIREMENTS.
Back to results New Search
Design your own personalised collection of standards. Keep your standards updated.