Committee:
SC 1 Water treatment
SC 2 Water supply
SC 3 Drainage, sewerage and discharge
SC 4 Water purification
GT 1 Flushable products
GT 2 Directrices de aguas residuales
ISO/TC 224 Drinking water, wastewater and stormwater systems and services
ISO/TC 282 Water reuse
CEN/TC 164 Water supply
CEN/TC 165 Waste water engineering
CEN/TC 426 Domestic appliances used for water treatment not connected to water supply
CEN/WS PROMISCES Soil-sediment-water system - Solutions to deal with PMT/vPvM substances
CEN/WS 079 Sustainable Integrated Water Use & Treatment in Process Industries "SustainWATER"
* Some activities of this TC correspond to other AEN/CTN.
Standards developed by the committee: CTN 149: 254
Status: ANULADA / 2018-10-31
Drain and sewer systems outside buildings
Status: ANULADA / 2018-06-01
SMALL WASTEWATER TREATMENT SYSTEMS FOR UP TO 50 PT. PART 1: PREFABRICATED SEPTIC TANKS.
Small wastewater treatment systems for up to 50 PT - Part 1: Prefabricated septic tanks
Small wastewater treatment systems for up to 50 PT - Part 3: Packaged and/or site assembled domestic wastewater treatment plants
Small wastewater treatment systems for up to 50 PT - Part 4: Septic tanks assembled in situ from prefabricated kits
Small wastewater treatment systems for up to 50 PT - Part 6: Prefabricated treatment units for septic tank effluent
Small wastewater treatment systems for up to 50 PT - Part 7: Prefabricated tertiary treatment units
Status: ANULADA / 2017-10-26
Water conditioning equipment inside buildings. Electrolytic treatment systems with aluminium anodes. Requirements for performance and safety, and testing
Status: ANULADA / 2017-05-25
Wastewater lifting plants for buildings and sites. Principles of construction and testing. Part 1: Lifting plants for wastewater containing faecal matter.
Wastewater lifting plants for buildings and sites. Principles of construction and testing. Part 2: Lifting plants for faecal-free wastewater.
WASTEWATER LIFTING PLANTS FOR BUILDINGS AND SITES. PRINCIPLES OF CONSTRUCTION AND TESTING. PART 3: LIFTING PLANTS FOR WASTEWATER CONTAINING FAECAL MATTER FOR LIMITED APPLICATIONS.
Wastewater lifting plants for building and sites. Principles of construction and testing. Part 4: Non-return valves for faecal-free wastewater and wastewater containing faecal matter.
Status: ANULADA / 2017-05-24
Water supply - Specification for indirectly heated unvented (closed) storage water heaters
Status: ANULADA / 2017-05-17
Gullies for buildings - Part 3: Quality control
Gullies for buildings - Part 4: Access covers
Gullies for buildings. Part 5: Gullies with light liquids closure.
Status: ANULADA / 2017-05-03
Water supply. Sizing of installations inside buildings conveying water.
Status: ANULADA / 2017-04-01
GULLY TOPS AND MANHOLE TOPS FOR VEHICULAR AND PEDESTRIAN AREAS. DESIGN REQUIREMENTS, TYPE TESTING, MARKING, QUALITY CONTROL.
Status: ANULADA / 2016-03-10
Survey of European Standards for rehabilitation of drain and sewer systems
Back to results New Search
Design your own personalised collection of standards. Keep your standards updated.