Skip main navigation
Committee

Committee:

CTN 100 - Air conditioning

Secretary:
AFEC - ASOCIACIÓN DE FABRICANTES DE EQUIPOS DE CLIMATIZACIÓN
Field of Activity:
Standardization of: Air conditioning facilities, equipment and components, including ventilation and heat pumps, comprising terminology, definitions, classification, design and calculation (including climatic data, comfort zones, etc.), characteristics related to function suitability, safety and test methods, as well as characteristics required to the safety and control devices used. Excluding: - Electric fans for household and similar use - Safety and reliability requirements of electrical and electronic components Note: Air conditioning means the air treatment process that is carried out along the year, controlling the temperature, moisture, purity and movement in an indoor ambient.
Structure:

GT 2 Ventiladores y ventilación

GT 3 Salas limpias y filtros de aire

GT 6 Bombas de calor. Acondicionadores de aire

GT 7 Dispositivos terminales

GT 8 Protección contra humo y fuego

GT 10 Calidad del ambiente interior

GT 11 Criterio de calificación de las instalaciones de climatización

GT 12 Legionela

GT 18 Revision de la Norma UNE 100166

GT 20 Desarrollo del anexo A de la norma EN 16798

GT 21 Sistemas de ventilación para la mitigación del radón

GT 23 Refrigeración

International Relations:

ISO/TC 86/SC 6  Testing and rating of air-conditioners and heat pumps

ISO/TC 117  Fans

ISO/TC 142  Cleaning equipment for air and other gases

ISO/TC 205  Building environment design

ISO/TC 209  Cleanrooms and associated controlled environments

CEN/CLC/WS SRI  Standardized On-site SRI Building Audits: Framework Development Workshop

CEN/SS B09  Energy Performance of Buildings Directive (EPBD)

CEN/SS I24  Industrial fans

CEN/TC 113  Heat pumps and air conditioning units

CEN/TC 156  Ventilation for buildings

CEN/TC 182  Refrigerating systems, safety and environmental requirements

CEN/TC 195  Cleaning equipment for air and other gases

CEN/TC 228  Heating systems and water based cooling systems in buildings

CEN/TC 243  Cleanroom technology

CEN/TC 247  Building Automation, Controls and Building Management

CEN/TC 371  Energy Performance of Buildings

CEN/TC 413  Insulated means of transport for temperature sensitive goods with or without cooling and/or heating device

CEN/WS EUBSUPERHUB  A harmonization of KPIs for supporting the next generation of EPCs

CEN/WS Hycool  Characterization of a hybrid heat pump module

Standards developed by the committee: Technical Standardisation Committee 100: 590

UNE-EN 14511-2:2004

Status: ANULADA2008-05-21

Air conditioners, liquid chilling packages and heat pumps with electrically driven compressors for space heating and cooling. Part 2: Test conditons.

UNE-EN 14511-1:2004

Status: ANULADA2008-05-07

Air conditioners, liquid chilling packages and heat pumps with electrically driven compressors for space heating and cooling. Part 1: Terms and definitions.

UNE-EN ISO 16484-5:2003 (Ratificada)

Status: ANULADA2008-04-01

Building automation and control systems - Part 5: Data communication protocolcity (ISO 16484-5:2003) (Endorsed by AENOR in February of 2004.)

UNE-EN 1506:1999

Status: ANULADA2007-10-31

VENTILATION FOR BUILDINGS - SHEET METAL AIR DUCTS AND FITTINGS WITH CIRCULAR CROSS-SECTION - DIMENSIONS

UNE-ENV 12097:1998

Status: ANULADA2007-10-17

VENTILATION FOR BUILDINGS. DUCTWORK. REQUIREMENTS FOR DUCTWORK COMPONENTS TO FACILITATE MAINTENANCE OF DUCTWORK SYSTEMS.

UNE-EN 13053:2003

Status: ANULADA2007-09-12

Ventilation for buildings. Air handling units. Ratings and performance for units, components and sections.

UNE 100104:1988

Status: ANULADA2007-01-24

AIR CONDITIONING. SHEET METAL DUCTS. RECEIVING TEST

UNE 100102:1988

Status: ANULADA2007-01-24

SHEET METAL DUCTS. THICKNESSES. JOINTS. REINFORCINGS.

UNE 100004:2006 IN

Status: ANULADA2006-12-21

Preventive maintenance for ventilation and air conditioning systems.

UNE 100040:1996

Status: ANULADA2006-12-20

PRESSURIZATION IN PROTECTED ESCAPE ROUTES.

UNE-EN 12900:2001

Status: ANULADA2006-05-31

REFRIGERANT COMPRESSORS. RATING CONDITIONS, TOLERANCES AND PRESENTATION OF MANUFACTURER'S PERFORMANCE DATA.

UNE 100010-1:1989

Status: ANULADA2005-12-07

AIR CONDITIONING. ADJUNSTING AND BALANCING OF HEATING TESTING. PART 1: INSTRUMENTATION

UNE 100010-2:1989

Status: ANULADA2005-12-07

AIR CONDITIONING. ADJUNSTING AND BALANCING OF HEATING TESTING. PART 2: MEASUREMENT

UNE 100010-3:1989

Status: ANULADA2005-12-07

AIR CONDITIONING. ADJUNSTING AND BALANCING OF HEATING TESTING. PART 3: ADJUSTING AND BALANCING

UNE 100011:1991

Status: ANULADA2005-09-07

AIR CONDITIONING. VENTILATION FOR AN ACCEPTABLE QUALITY OF THE AIR IN AIR CONDITIONING OF ROOMS.

UNE 100030:2002 IN ERRATUM

Status: ANULADA2005-09-07

Guidance for the prevention and control of multiplication and dispersion of legionella.

UNE 100030:2001 IN

Status: ANULADA2005-09-07

Guidance for the prevention and control of multiplication and dispersion of legionella.

UNE 100713:2003

Status: ANULADA2005-09-07

Air conditioning in hospitals.

UNE 100151:2004

Status: ANULADA2005-06-22

AIR CONDITIONING. SITE PRESSURE TESTING OF PIPEWORK.

UNE 100020/1M:1999

Status: ANULADA2005-04-20

AIR CONDITIONING. MACHINE ROOMS.