CTN 207/SC 99 - Electrical power installations in systems with nominal voltages above 1 kv a.c.

Secretary:
UNE - ASOCIACIÓN ESPAÑOLA DE NORMALIZACIÓN
International Relations:

IEC/TC 37  Surge arresters

IEC/TC 99  Insulation co-ordination and system engineering of high voltage electrical power installations above 1,0 kV AC and 1,5 kV DC

IEC/TC 109  Insulation co-ordination for low-voltage equipment

IEC/PC 127  Low-voltage auxiliary power systems for electric power plants and substations

CLC/SR 37  Surge arresters

CLC/SR 109  Insulation co-ordination for low-voltage equipment

CLC/TC 99X  Power installations exceeding 1 kV a.c. (1,5 kV d.c.)

* Some activities of this TC correspond to other AEN/CTN.

Standards developed by the committee: CTN 207/SC 99: 54

UNE 207023:2025

Status: VIGENTE / 2025-07-23

Grounding electrode. Coupling cylindrical bars of Steel-copper.

UNE-EN IEC 60071-2:2024

Status: VIGENTE / 2024-07-17

Insulation co-ordination - Part 2: Application guidelines

UNE 21087-3:1995

Status: VIGENTE / 2024-01-26

SURGE ARRESTERS. PART 3: ARTIFICIAL POLLUTION TESTING OF SURGE ARRESTERS.

UNE-EN IEC 60071-11:2022/AC:2023-12 (Ratificada)

Status: VIGENTE / 2024-01-01

Insulation co-ordination - Part 11: Definitions, principles and rules for HVDC system (Endorsed by Asociación Española de Normalización in January of 2024.)

UNE-EN IEC 61936-2:2023 (Ratificada)

Status: VIGENTE / 2023-12-01

Power installations exceeding 1 kV AC and 1,5 kV DC - Part 2: DC (Endorsed by Asociación Española de Normalización in December of 2023.)

UNE-EN IEC 60071-11:2022 (Ratificada)

Status: VALID / 2023-01-01

Insulation co-ordination - Part 11:Definitions, principles and rules for HVDC system

UNE-EN IEC 60071-12:2022 (Ratificada)

Status: VALID / 2023-01-01

Insulation co-ordination - Part 12: Application guidelines for LCC HVDC converter stations (Endorsed by Asociación Española de Normalización in January of 2023.)

UNE-EN 50522:2022

Status: VIGENTE / 2022-11-02

Earthing of power installations exceeding 1 kV a.c.

UNE-EN IEC 61936-1:2021 (Ratificada)

Status: VIGENTE / 2022-09-07

Power installations exceeding 1 kV AC and 1,5 kV DC - Part 1: AC (Endorsed by Asociación Española de Normalización in October of 2021.)

UNE-EN IEC 60664-1:2021

Status: VIGENTE / 2021-02-24

Insulation coordination for equipment within low-voltage supply systems - Part 1: Principles, requirements and tests

UNE 21056:2000 ERRATUM

Status: VIGENTE / 2021-02-16

Grounding electrode. Coupling cylindrical bars of steel-copper.

UNE 21056:1981

Status: VIGENTE / 2021-02-16

GROUNDING ELECTRODE. COUPLING CYLINDRICAL BARS OF STEEL-COPPER.

UNE-EN IEC 60071-1:2020

Status: VIGENTE / 2020-06-24

Insulation co-ordination - Part 1: Definitions, principles and rules

UNE-EN IEC 60071-2:2018

Status: VIGENTE / 2018-10-17

Insulation co-ordination - Part 2: Application guidelines

UNE-EN IEC 60099-5:2018 (Ratificada)

Status: VIGENTE / 2018-05-01

Surge arresters - Part 5: Selection and application recommendations (Endorsed by Asociación Española de Normalización in May of 2018.)

UNE-EN IEC 60099-8:2018 (Ratificada)

Status: VIGENTE / 2018-03-01

Surge arresters - Part 8: Metal-oxide surge arresters with external series gap (EGLA) for overhead transmission and distribution lines of a.c. systems above 1 kV (Endorsed by Asociación Española de Normalización in March of 2018.)

UNE-EN 60664-3:2018

Status: VIGENTE / 2018-02-28

Insulation coordination for equipment within low-voltage systems - Part 3: Use of coating, potting or moulding for protection against pollution

UNE-EN 60099-4:2016

Status: VIGENTE / 2016-11-23

Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems

UNE-EN 60071-5:2015

Status: VIGENTE / 2015-10-21

Insulation co-ordination - Part 5: Procedures for high-voltage direct current (HVDC) converter stations

UNE-EN 60099-9:2014 (Ratificada)

Status: VIGENTE / 2015-01-01

Surge arresters - Part 9: Metal-oxide surge arresters without gaps for HVDC converter stations (Endorsed by AENOR in January of 2015.)