Skip main navigation
Committee

Committee:

CTN 203/SC 65 - Industrial-process measurement and control. Fieldbus

Secretary:
SERCOBE - ASOCIACIÓN NACIONAL DE FABRICANTES DE BIENES DE EQUIPO
International Relations:

IEC/TC 65  Industrial-process measurement, control and automation

CLC/TC 65X  Industrial-process measurement, control and automation

CEN/CLC/WS BIOMAT  Data-driven management of production processes

Standards developed by the committee: CTN 203/SC 65: 820

UNE-EN 50254:1998 (Ratificada)

Status: ANULADA / 2007-04-01

HIGH EFFICIENCY COMMUNICATION SUBSYSTEM FOR SMALL DATA PACKAGES (Endorsed by AENOR in April of 1999.)

UNE-EN 61158-2:1994 (Ratificada)

Status: ANULADA / 2007-04-01

FIELDBUS STANDARD FOR USE IN INDUSTRIAL CONTROL SYSTEMS. PART 2: PHYSICAL LAYER SPECIFICATION AND SERVICE DEFINITION.

UNE-EN 61158-2/A1:1996 (Ratificada)

Status: ANULADA / 2007-04-01

FIELDBUS STANDARD FOR USE IN INDUSTRIAL CONTROL SYSTEMS. PART 2: PHYSICAL LAYER SPECIFICATION AND SERVICE DEFINITION (Endorsed by AENOR in May of 1996.)

UNE-EN 61158-2/A2:1996 (Ratificada)

Status: ANULADA / 2007-04-01

FIELDBUS STANDARD FOR USE IN INDUSTRIAL ONTROL SYSTEMS. PART 2: PHYSICAL LAYER SPECIFICATION AND SERVICE DEFINITION (Endorsed by AENOR in November of 1997.)

UNE-EN 61003-1:1992 (Ratificada)

Status: ANULADA / 2007-03-01

INDUSTRIAL-PROCESS CONTROL SYSTEMS. INSTRUMENTS WITH ANALOGUE INPUTS AND TWO-OR MULTI-STATE OUTPUTS.PART 1: METHODS OF EVALUATING THE PERFORMANCE. (Endorsed by AENOR in April of 1996.)

UNE-EN 60873:1996

Status: ANULADA / 2006-12-01

METHODS OF EVALUATING THE PERFORMANCE OF ELECTRICAL AND PNEUMATIC ANALOGUE CHART RECORDERS FOR USE IN INDUSTRIAL-PROCESS CONTROL SYSTEMS.

UNE-EN 61131-1:1996

Status: ANULADA / 2006-07-01

PROGRAMMABLE CONTROLLERS. PART 1: GENERAL INFORMATION.

UNE-EN 61131-2 CORR:1999

Status: ANULADA / 2006-05-01

PROGRAMMABLE CONTROLLERS. PART 2: EQUIPMENT REQUIREMENTS AND TESTS.

UNE-EN 61131-2:1997

Status: ANULADA / 2006-05-01

PROGRAMMABLE CONTROLLERS. PART 2: EQUIPMENT REQUIREMENTS AND TESTS.

UNE-EN 61131-2/A12:2001

Status: ANULADA / 2006-05-01

Programmable controllers -- Part 2: Equipment requirements and tests.

UNE-EN 61131-2/A11:1997

Status: ANULADA / 2006-05-01

PROGRAMABLE CONTROLLERS. PART 2: EQUIPMENT REQUIREMENTS AND TESTS.

UNE-EN 61131-2/A11 CORR:1999

Status: ANULADA / 2006-05-01

PROGRAMMABLE CONTROLLERS. PART 2: EQUIPMENT REQUIREMENTS AND TESTS.

UNE-EN 61131-3:1997

Status: ANULADA / 2005-12-01

PROGRAMMABLE CONTROLLERS. PART 3: PROGRAMMING LANGUAGES.

UNE-EN 50325-1:2000 (Ratificada)

Status: ANULADA / 2005-07-01

Industrial communications subsystem based on ISO 11898 (CAN) for controller-device interfaces -- Part 1: General requirements (Endorsed by AENOR in December of 2001.)

UNE-EN 61207-3:1999 (Ratificada)

Status: ANULADA / 2005-05-01

Gas analyzers - Expression of performance -- Part 3: Paramagnetic oxygen analyzers. (Endorsed by AENOR in May of 2001.)

UNE-EN 61207-6:1994 (Ratificada)

Status: CANCELLED/2004-03-18

EXPRESSION OF PERFORMANCE OF GAS ANALYZERS. PART 6: PHOTOMETRIC ANALYZERS. (Endorsed by AENOR in May of 1996.)

UNE-EN 61207-2:1994 (Ratificada)

Status: ANULADA / 2002-09-26

Expression of performance of gas analyzers - Part 2: Oxygen in gas (utilizing high-temperature electrochemical sensors)

UNE-EN 61207-1:1994 (Ratificada)

Status: ANULADA / 2002-06-28

EXPRESSION OF PERFORMANCE OF GAS ANALYZERS. PART 1: GENERAL. (Endorsed by AENOR in May of 1996.)

UNE-EN 60534-2-2:1994

Status: ANULADA / 2001-12-01

INDUSTRIAL-PROCESS CONTROL VALVES. PART 2: FLOW CAPACITY. SECTION TWO: SIZING EQUATIONS FOR COMPRENSSIBLE FLUID FLOW UNDER INSTALLED CONDITIONS.

UNE-EN 60534-2-1:1992 (Ratificada)

Status: ANULADA / 2001-12-01

INDUSTRIAL-PROCESS CONTROL VALVES. PART 2: FLOW CAPACITY. SECTION ONE: SIZING EQUATIONS FOR INCOMPRESSIBLE FLUID FLOW UNDER INSTALLED CONDITIONS. (Endorsed by AENOR in April of 1996.)