Committee:
GT 2 Encofrados
GT 4 Plataformas de carga y descarga
CEN/TC 53 Temporary works equipment
* Some activities of this TC correspond to other AEN/CTN.
Standards developed by the committee: CTN 180: 39
Status: VIGENTE / 2025-03-12
Formwork. General Design, performance requirements and verifications
Status: VIGENTE / 2025-01-01
Façade scaffolds made of prefabricated components - Part 1: Products specifications
Façade scaffolds made of prefabricated components - Part 2: Particular methods of structural design
Temporary works equipment - Part 1: Scaffolds - Performance requirements and general design
Temporary works equipment - Part 2: Information on materials
Temporary works equipment - Part 4: Protection fans for scaffolds - Performance requirements and product design
Status: VIGENTE / 2024-03-04
Couplers, spigot pins and baseplates for use in falsework and scaffolds - Part 3: Plain base plates and spigot pins - Requirements and test procedures
Falsework - Performance requirements and general design
Temporary works equipment - Part 3: Load testing.
Trench lining systems - Part 1: Product specifications.
Trench lining systems - Part 2: Assessment by calculation or test.
Status: VIGENTE / 2024-01-01
Adjustable telescopic steel props - Product specifications, design and assessment by calculation and tests
Adjustable telescopic aluminium props - Product specifications, design and assessment by calculation and tests
Status: CURRENT/2022-09-28
Couplers, spigot pins and baseplates for use in falsework and scaffolds - Part 1: Couplers for tubes - Requirements and test procedures
Couplers, spigot pins and baseplates for use in falsework and scaffolds - Part 2: Special couplers - Requirements and test procedures
Status: VIGENTE / 2022-03-30
Mobile access and working towers made of prefabricated elements - Part 2: Rules and guidelines for the preparation of an instruction manual
Status: VIGENTE / 2021-06-05
Temporary works equipment - Encapsulation constructions - Performance requirements and general design (Endorsed by AENOR in December of 2016.)
Status: VIGENTE / 2021-05-12
Mobile access and working towers made of prefabricated elements - Part 1: Materials, dimensions, design loads, safety and performance requirements
Status: VIGENTE / 2021-03-05
Manually operated hydraulic shoring systems for groundwork support - Part 1: Product specifications
Manually operated hydraulic shoring systems for groundwork support - Part 2: Assessment by calculation or test
Back to results New Search
Design your own personalised collection of standards. Keep your standards updated.