Skip main navigation
Standard
UNE 53929:2022

UNE 53929:2022

Plásticos. Rehabilitación de conducciones de abastecimiento y alcantarillado con tubos continuos curados in situ (CIPP). Diseño, cálculo e instalación.

Plastics. Rehabilitation of supply and sewerage pipes with continuous cured tubes in situ (CIPP). Design, calculation and installation

Plastiques. Réhabilitation des conduites d'adduction et d'assainissement avec des conduites continues durcies in situ (CIPP). Conception, calcul et installation

Buy on AENOR

This standard is available in:

Print and digital format

Spanish